Appearance
Linking Verifications
After creating verifications and requirements, they need to be linked in order to create traceability. This can be done easily via drag & drop. To do so, click on the orange chain symbol of the requirement as indicated below, drag it to the corresponding verification, and drop it on the orange/black chain symbol of the target verification. The linking can be done in both directions and has always the same meaning. It is a direct link between a requirement and a verification.